Forum Title: How Many Doors Set In A Day?
Hey guys, I recently started doing interior trim with the company I work for, normally I'm a backout guy or framer. I'm wondering how many interior doors per day I should be setting. These have hoops, but none attached to the jambs already, had to cut down the jambs on almost every one cause the floor wasn't level and a bunch of spots had to trim the casing to fit. Figure an 8 hour work day, subtract 15 mins for break and probably 30 mins for roll out/up. Combine that with getting the other guy started on window trim ect, Id say I spent 7 hours total to get 9 doors in. Wondering if that's good or bad. I was averaging 35 mins per door.
Category: General Contractor Post By: VERA WATTS (Athens, GA), 03/02/2018

Guidance, Tips & Support For Homeowners

Blog With Home Construction Companies In Your Area
See All
requestaquote Get Free Quotes callnow 888-506-9527